At Construction Robotics, we love to talk about smart construction solutions, advancing technology for lifting materials. We’re particularly passionate about improving safety through technology.
I think I can do this until I retire with these things.
Duane Czaicki, Mason, Miron Construction Co., Inc.
It’s helped us keep schedule by having the MULEs on site.
Todd Higgins, Director, Masonry, Miron Construction Co., Inc.
Considering each block weighed more than 100 lbs, this was a needed time (and back!) saver!
Bo Snyder, VDC Manager at Barton Malow Company
Everybody is happy that we have it here. It’s an amazing machine, making everybody’s job easier – units are going in faster, everyone is going home at the end of the day feeling a lot less tired. I can’t say enough good things about the MULE. Thank you, guys!
Nick Martin, Leidal & Hart Mason Contractors
Our field guys at Ford VPEC with Stenco Construction are LOVING the two MULEs on the project! Increased production with less fatigue - we all win!
Mike Harman, President Leidal & Hart Mason Contractors