In addition to bunk rooms, the facility will include laundry rooms on each floor, a dayroom/multi-purpose room, lounges, computerized classrooms, and a vending/kitchen area.
Jimmy Z Masonry awarded the masonry sub-contract leveraged Construction Robotic’s MULE smart lift-assist technology to regain bid dollars, through increased productivity (3 Masons to 1 MULE). This project had 12 MULEs to maximize productivity. Using 8832s and the MULE, a production increase of 93% was calculated for square feet installed. Additionally, a 75% increase was recognized for franklin stone, with the new Veneer attachment for MULE.