Lift less. Lay more.

The MULE is a lift-assist machine that grabs, lifts and holds the weight of construction materials up to 100 lb (MZ100) or 150 lb (ML150), so you can guide them into place by hand, all day. Crews use it for block, stone veneer, retaining walls, and other heavy materials.

The MULE is a lift-assist machine that grabs, lifts and holds the weight of construction materials up to 100 lb (MZ100) or 150 lb (ML150), so you can guide them into place by hand, all day. Crews use it for block, stone veneer, retaining walls, and other heavy materials.

Meet the MULE

Two machines. One job: take the weight off your crew.

Pick the MULE that fits your material and your jobsite. Both work with the scaffolding and lifts you already use.

MULE MZ100 lift-assist machine

MULE MZ100

Battery powered

Compact, cordless and weatherproof, built to speed up block laying inside and out.

Lifts up to 100 lb

Up to 32 hours per charge, 5,000+ lifts

Recharges from a standard extension cord

Weatherproof, and compact enough for interior work

MULE ML150 lift-assist machine

MULE ML150

Plug-in power

More capacity for bigger block and heavier material, running on standard jobsite power.

Lifts up to 150 lb, upgradable to 200 lb

Runs on 110V power or an inverter generator

12 ft reach radius

Multiple bases and attachments for your setup

A mason guiding a concrete block held by the MULE

How it works

The machine carries the weight. Your mason keeps control.

1

Grab

The gripper clamps onto block, stone or other heavy material straight from the pallet.

2

Lift

The MULE takes the load, so heavy material feels virtually weightless in the mason’s hands.

3

Place

Your mason guides it into position and sets it by hand, with the same control and craftsmanship.

Trusted by contractors & crews across the globe.

Icon

Duane Czaicki,

Mason, Miron Construction Co., Inc.

“I think I can do this until I retire with these things.”

Todd Higgins

It’s helped us keep schedule by having the MULEs on site.”

Bo Snyder

“Considering each block weighed more than 100 lbs, this was a needed time (and back!) saver!”

Nick Martin

“Everybody is happy that we have it here. It’s an amazing machine, making everybody’s job easier – units are going in faster, everyone is going home at the end of the day feeling a lot less tired. I can’t say enough good things about the MULE. Thank you, guys!”

Tony Avila

"30 years in the industry and I have never seen anything with as much potential to change our industry as these MULEs."

Glenn Hottmann

"We added four MULEs to our team and for every two days with a MULE I pick up a day on our schedule. Our most recent project had 12” split face CMUs, what would have been a 22 day project was completed in 15 and we are seeing an overall savings between 30% and 50%."

Don Abrino

"As proven in the construction industry, the MULE-R greatly extends a worker’s ergonomic range, reducing the likelihood of strain and injuries, while allowing for greater productivity, efficiency, and an improved work environment."

Honcho - Mason

“The mule is wonderful man it works wonders out here i think it saves your shoulders it saves your back i really love it. I wish I had the MULE three weeks ago.”

Trusted by contractors & crews across the globe.

Icon

Duane Czaicki,

Mason, Miron Construction Co., Inc.

“I think I can do this until I retire with these things.”

Todd Higgins

It’s helped us keep schedule by having the MULEs on site.”

Bo Snyder

“Considering each block weighed more than 100 lbs, this was a needed time (and back!) saver!”

Nick Martin

“Everybody is happy that we have it here. It’s an amazing machine, making everybody’s job easier – units are going in faster, everyone is going home at the end of the day feeling a lot less tired. I can’t say enough good things about the MULE. Thank you, guys!”

Tony Avila

"30 years in the industry and I have never seen anything with as much potential to change our industry as these MULEs."

Glenn Hottmann

"We added four MULEs to our team and for every two days with a MULE I pick up a day on our schedule. Our most recent project had 12” split face CMUs, what would have been a 22 day project was completed in 15 and we are seeing an overall savings between 30% and 50%."

Don Abrino

"As proven in the construction industry, the MULE-R greatly extends a worker’s ergonomic range, reducing the likelihood of strain and injuries, while allowing for greater productivity, efficiency, and an improved work environment."

Honcho - Mason

“The mule is wonderful man it works wonders out here i think it saves your shoulders it saves your back i really love it. I wish I had the MULE three weeks ago.”

Trusted by contractors & crews across the globe.

Duane Czaicki,

“I think I can do this until I retire with these things.”

Where it works

Built for masonry. Proven across the jobsite.

Masonry is where the MULE started, and crews now use it on retaining walls, solar, concrete, manufacturing and refractory work too.

Buying made easy

Own it, rent it or finance it.

Get the MULE on your job in the way that fits your budget, backed by the team that builds it.

Buy

Purchase new or used MULEs, with multi-unit discounts for growing fleets.

Get a quote →

Rent

Put a MULE on your next job before you commit to buying one.

See rental terms →

Finance

Flexible equipment financing through JLG Financial and LEAF Commercial Capital.

Ask about financing →

Support

Guides and help for the MZ100 and ML150, from the people who design and build them.

Visit support →

Book a demo

See the MULE on your jobsite.

Tell us about your next job and we’ll show you which MULE fits your crew, your scaffolding and your budget.