On the House of Sports project, Spartan is running a fleet of MZ100s to set 32" long CMU. On a job this size, the MULE pays off.

Inner Banner
1 / 6

Project Name

House of Sports

Contractor

Spartan Masonry

Architect

Architect

Project Type

Commercial

Material

32" CMU

Spartan didn’t buy right away. They rented MZ100s and tried them on a small job first. The trial broke even against their hand-set bid while the crew was still learning the site logistics. That was enough proof, and in 2024 they bought eight MULEs.

With the MULEs on site, Spartan raised its daily production and changed how it bids. Its estimates now use higher production numbers, and the jobs it used to pass on are the ones it goes after.

Two years in, Spartan is winning more bids and is busier and more productive than ever. Their masons are doing more and lifting more without burning out, and they still go home feeling good.

“A lot of guys really love them [MULEs]. They don’t want to be on a job without them.”
Jake Torres, Foreman, Spartan Construction

On the jobsite: House of Sports

On the House of Sports project, Spartan is running a fleet of MZ100s to set 32" long CMU. On a job this size, the MULE pays off.

Many masonry contractors wait for a big job like this before they upgrade their equipment. But the contractors who already run MULEs are the ones winning these bids. They brought the technology into their process early, so they can bid higher production numbers with confidence.

Products

MZ100

MZ100

MAST ADAPTER - HYDROMOBILE/PROSERIES M2/P

MAST ADAPTER - HYDROMOBILE/PROSERIES M2/P

GROUND BASE

GROUND BASE

Spartan didn’t buy right away. They rented MZ100s and tried them on a small job first. The trial broke even against their hand-set bid while the crew was still learning the site logistics. That was enough proof, and in 2024 they bought eight MULEs.

With the MULEs on site, Spartan raised its daily production and changed how it bids. Its estimates now use higher production numbers, and the jobs it used to pass on are the ones it goes after.

Two years in, Spartan is winning more bids and is busier and more productive than ever. Their masons are doing more and lifting more without burning out, and they still go home feeling good.

“A lot of guys really love them [MULEs]. They don’t want to be on a job without them.”
Jake Torres, Foreman, Spartan Construction

On the jobsite: House of Sports

On the House of Sports project, Spartan is running a fleet of MZ100s to set 32" long CMU. On a job this size, the MULE pays off.

Many masonry contractors wait for a big job like this before they upgrade their equipment. But the contractors who already run MULEs are the ones winning these bids. They brought the technology into their process early, so they can bid higher production numbers with confidence.