

Grade / Ground / Floor
Sub-Grade Work
Below-grade CMU foundation wall. The MULE stages from the top of the excavation and reaches over the trench, so the crew places heavy block without carrying it into the cut.


1 / 5
Project Name
Sub-Grade Work
Contractor
Spartan
Architect
Architect
Project Type
Commercial
Material
12" CMU







