Frame / Pipe Scaffolding A-Frame / Traditional
Grade / Ground / Floor
Marion Township Park
6000 splitface block pavillion and bathroom for a park in Maria Stein, OH. Dablees Masonry brought the MULE to a 6,000-block splitface pavilion and restroom for Marion Township Park — running a single MZ100 on two 5-foot masts and a ground base to handle the 8" CMU. For owner Dan Moorman, the math is straightforward: he expects the MULE to add about 20% to production on a normal week, and closer to 40% when the heat sets in and a crew laying block by hand would otherwise be slowing down. That hot-weather gap is the part contractors feel most — the MULE doesn't tire out at 2 p.m., so the back half of a brutal day stays as productive as the front
1 / 3
Project Name
Marion Township Park
Contractor
Dablees Masonry
Project Type
Commercial
Material
8" Splitface CMU
Location
Maria Stein, Ohio
Year
2026