

Crank Up
Water Treatment Plant
Angel Buildings proves that the seasons can't stop masons deploying the MULE MZ100, even inside a conditioned Winter Enclosure. The MULE setup integrated seamlessly within the tented space. To maximize job site efficiency and protect their crew from physical strain, the team paired EZ scaffolding with heavy-duty 32" CMU blocks. By blending smart logistics with advanced robotics, Angel Buildings successfully turned a demanding winter build into a masterclass in ergonomics and high-speed production.


1 / 7
Project Name
Water Treatment Plant
Contractor
Angel Buildings
Architect
Architect
Project Type
Heavy Civil/Infrastructure
Material
32" CMU







